19岁大学生真人免费观看电视剧,小说极品岳母,日本伦理三级成人电影,久久爱福利电影,真实的与子乱刺激对白,波多野结高清无码中文dvd,神马三级伦理片,他最野了小说全文,聪明的妻子怎么面对老公外遇

 
 

Home/News

CGGC wins the bid for the Baihetan Hydropower Station

Updated: 2014-04-18

April 14 celebrated the success of CGGC in bidding for the Right-bank Project of Baihetan Hydropower Station.

Located in Ningnan County of Sichuan Province and Qiaojia County of Yunan Province, the station is the second cascade hydropower station built on the main stream of the lower reaches of the Jinsha River, designed mainly for power generation with other functions such as flood control, sedimentation of sand, improvement of downstream navigation conditions, and development of reservoir-area water transportation.

When completed, it will be China’s second largest hydropower station, only next to the Three Gorges Hydropower Station. It adopts a 289m-high double-curvature arch concrete dam whose crest elevation is 834m, crest width is 13m and maximum base width is 72m. With a normal water level of 825.0m, the reservoir has a total capacity of 20.627 billion cubic meter.

 

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.